Period:
2017 – 2018
Description:
The intervention consists in the redevelopment of the sector of the Varese stations. The project aims to renovate the public space, to improve mobility between the city, the suburbs and the hospital and to promote social re-launch and security.
Location:
Varese
Sponsor:
Municipality of Varese
Client:
Milan Ingegneria S.r.l.
Project team:
Open Building Research S.r.l.
(architectural project and group leader)
Studio ARCODE
(architectural project and local coordination)
Milan Ingegneria S.r.l.
(structural project)
Corbellini S.r.l.
(plant design)
Systematica S.r.l.
(mobility project)
dott. Marco Parmigiani
(geology project)
Services:
Quantity surveying (structural operations)
B&B Progetti team:
Mr. Giampiero Brioni – B&B Progetti S.r.l.
(General coordination)
Mr. Marco Baccaro – B&B Progetti S.r.l.
(Project Manager)
Mr. Marco Fornoni – B&B Progetti S.r.l.
(Cost Engineer)
Mr. Emanuele Bertoli – B&B Progetti S.r.l.
(Cost Engineer)
Ms. Elena Iualè – B&B Progetti S.r.l.
(Cost Engineer)